#BureauOfIndianStandards
How to Prepare a Furniture Factory for BIS Inspection
Passing furniture testing is only one part of BIS certification. This factory-readiness guide explains how manufacturers should prepare machinery, laboratories, calibration, drawings, materials, personnel, records and representative production samples before BIS inspection.
BIS Furniture Certification Is Not Just Product Testing
A furniture product can pass a laboratory test while the certification application still faces delays or rejection. BIS certification evaluates the manufacturing system behind the sample—including factory infrastructure, process controls, model scope, testing capability, calibration, records, marking and traceability.
